[1]
“Analisis Penjadwalan Proyek Dengan Metode PERT Menggunakan Microsoft Project 2016”, suryabeton, vol. 5, no. 1, pp. 37–45, Mar. 2021, doi: 10.37729/suryabeton.v5i1.1107.